I am finishing up Phase II of my ventilation and dry bilge projects. I’ve run 160 ft of wire fore to aft, and port and starboard. Switch box made to control 4 compartment fan circuits, and a midship bus installed to connect these and cabin fans to the main panel. I’m happy with the execution of the plan (which was in my head), and fortunate that my lack of measuring beforehand for the placement of the switch box did not interfere with the reinstallation of the below galley cabinet door. There is no accounting for dumb luck!






